Departamento en San Miguel — autovalúo S/180,000
Cálculo (tramo 1 + tramo 2):
- Tramo 1: 0.2% × S/82,500 = S/165.00
- Tramo 2: 0.6% × (S/180,000 − S/82,500) = 0.6% × S/97,500 = S/585.00
- Total anual: S/750.00
- Cuota trimestral: S/187.50 (sin contar reajuste IPM en cuotas 2-4)

